Sukhar Electric allows users to apply for a new connection online. It’s a massive facility. If you want to apply for a connection online, you must specify whether you want a residential or commercial connection. If you want to employ offline methods, you can do so. Apply through the regional office, then go to the office and fill out an application for a new meter, which you must send to the appropriate person. There is a piece about you. A new Sepco connection guideline is available if you want to use it.
Contents
SEPCO Connection Types
Usually, everyone is aware of the two types of connections. The first is the Domestic connection, and the second is the Commercial connection. There are, however, several sorts of connections, such as industrial and T. well connections.
Let’s imagine you’re looking for a new connection. Then, before you apply, make sure your connection type is correct. Because if you’re planning to set up a home connection but make a mistake. You can use a commercial user name with it. Then you’ve got a problem.
SEPCO New Connection
The connection type is unaffected by the name. Throughout, it differs from one another. Demand notices for domestic use are less expensive than commercial demand notices. The same as the commercial connection’s unit rate, it’s highly pricey.
How to apply for SEPCO’s new connection?
To create a new connection, click the button above. The link will take you to an official website where you can apply it. To apply online, you’ll need the following information: connection type, applicant name, CNIC number, an electric bill from a neighbor, etc. There is an online form that you must complete with the relevant information. Then send it in. You will be given a tracking ID following submission, which is very important.
The electric supply company takes 30 days to install a new connection. After applying for a new connection, a Sepco official arrived to check your location. Assume your distance exceeds the good. The official has the power to turn down your connection. You can file a second demand notice following the visit concerning a sum offered to the bank. If you apply online, you can also track the status of your application.
There are three types of connections to examine. You can choose a category based on how much electricity is used.
Category 1 | 1kwH to 15kwH | AM / SDO |
---|---|---|
Category 2 | 16kwH to 70kwH | DM / XEN |
Category 3 | 71kwH to 500kwH | Manager / S.E |
SEPCO Demand Notice Tracking
You can trace your whole demand notice process online with a tracking ID. It is necessary to preserve the tracking id used by the meter and other devices. If you have a problem, the electric company will track it using a tracking id because they do not have any information in a consumer name or a CNIC number.
SEPCO Demand Notice fee
Sepco’s new connection price varies depending on the type of connection. Commercial and domestic connections, for example, differ from one another.
How to Check SEPCO Demand Notice Online?
You can check your demand notice to see if you can apply for a new connection online. We will send you a URL where you can enter your CNIC and connection type to track your order online. You can get all of the information about your connections. If you apply manually at the workplace, it’s possible that you won’t be able to locate your connection status.
Further, if you want to download your SEPCO Duplicate Bill click here