MEPCO New Connection 2022-Domestic & Commercial

Since the Multan region has a high number of customers, so MEPCO is Punjab’s largest power company. Because of its extensive consumer base, it mainly covers southern Punjab, which includes many tiny villages. As a result, this electric company provides power to every little community. As a result, the government decided to convert its manual system to MEPCO online application. Applying for a MEPCO New Connection is now simple and free. You no longer need to go to the regional offices to apply for a new connection. You can apply online and start your journey from wherever you want.

How can you apply for a MEPCO New Connection?

If you’re a Multan Electric Power Company (MEPCO) customer who wants to install a meter, click the button below, which will take you to MEPCO’s online application for a new connection. Where you can fill out the following information on the web form:
Connection Type: Domestic, used in households, is similar to Commercial, mainly used in stores or small businesses.

  • Applicant Name CNIC Number
  • 2 Mobile Numbers
  • Present Address
  • Permanent Address
  • Email Address
  • No. of meter already Installed:

Neighbor Information: Name and address of your next-door neighbor’s meter
Following the submission of the form, you will receive a verificatory email. Your tracking id will be included in this email, indicating that you have completed the form and got the email.
WAPDA analyses your application when you submit it online and then comes to your place to install the connection. If your area is far away, a WAPDA officer has the authority to approve a new link application. The WAPDA person’s primary responsibility is to ensure that users are not inconvenienced and that the connection is authorized. Following approval, MEPCO sends a demand notice, which must be submitted to any Pakistani national bank. To download your MEPCO New Connection Application Form click the button below

MEPCO demand Notice Tracking 2022

When you send the demand notice, you may also track it. MEPCO customers appreciate this monitoring system because it allows them to keep an eye on everything from their own homes. People used to go to regional or subdivision offices to find out about their connections, following the submission and verification of the demand notice. Users of MEPCO should install the new link in the chosen location.

MEPCO New Connection Status

Use the tracking ID you received after submitting the new connection application form to verify the status of your MEPCO new connection. It’s an essential piece of information for determining the status of an application. There is no way to track the app if you lose that id. So, via the official website www.enc.com.pk, quickly follow all of the application’s steps. You can also check your New Meter Connection Status, and MEPCO New Connection Tracking from this website too.

MEPCO New Connection Fee 2022

There are two types of connections: single-phase and three-phase. Single-phase connections are used in houses, while three-phase links are used in small industries or tube wells, among other things.

ENC MEPCO fee Single phase

With a 40-meter length of service line cable, the single-phase connection cost is Rs 4000. If someone wishes to extend their home’s long-distance service, they must pay Rs 200 per meter.

ENC MEPCO Fee for Three-phase connection

The MEPCO New Connection charges for a three-phase connection, which includes a 40-meter cable, is RS 15000 per code. If the customer’s length increases by 35 meters, they must pay RS 260 per code.

How do I check my MEPCO demand notice?

The quickest way to check the Demand Notice is to do the following:
‘ENC.COM.PK’ is the LESCO website.
With an option on the left side of the screen, you can print the demand notice.
There will be two choices in front of you. 1) Establishing a new connection 2) Modifications to the name, tariff, or load.
Select one of the options.
Enter your tracking id or CNIC.